|
|
|
|
|
|
|
Desalination
Project Code |
Project Leader |
Project Title |
Client |
Starting Date |
Completion Date |
Duration |
WD001 |
Dr.Essam El-Sayed Dr. M. Abdel-Jawad |
Development of The Pressure Exchanger for Reverse Osmosis Desalting Plants |
MEW |
1.5.1996 |
30.4.1999 |
36 months |
WD002 |
Mr. Sadeq Ebrahim |
Research and Development on Desalination by Reverse Osmosis |
KFAS |
1.5.1994 |
28.2.1996 |
22 months |
WD00 |
Dr. M. Abdel Jawad |
Seawater Desalination by Reverse Osmosis |
MEW |
1.7.1995 |
31.6.1998 |
36 months |
WD001C |
Dr. Y.Al-Wazzan S.Ebrahim |
A Pilot Study for the Treatment and Reuse of Drainage Water in Residential Areas of Kuwait |
KFAS |
1.12.1997 |
30.11.2000 |
36 months |
WD006C |
Dr. M. Abdel Jawad |
Characterization of Seawater Quality And Design Criteria For Future Construction of RO Pretreatment Systems at Az-Zour North and Sabiya Sites. |
MEW |
1.3.1998 |
30.6.1999 |
16 months |
WT001C |
Dr. Essam El-Sayed |
Feasibility of an Innovative Improvement of the MSF Process |
KFAS |
1.7.2001 |
31.12.2002 |
18 months |
WT004C |
Mr. Ali Al-Odwani |
Multistage Flash Distillation of Plants : Evaluation of Materials Performance in Heat Recovery Section |
KFAS |
1.1.2002 |
31.1.2005 |
37 months |
WT006C |
Dr. Essam El-Sayed |
Development Of Seawater Pretreatment Applications Using Zee Weed Membranes |
Zenon |
1.2.2003 |
31.10.2006 |
45 months |
WT008K |
Mr. Ali Al-Odwani |
Pilot Study on High Quality Freshwater Production Utilizing Beachwells |
KISR |
1.8.2003 |
31.3.2006 |
32 months |
WT011C |
Dr. Essam El-Sayed |
A Study on Desalination Options in Kuwait |
NTEC |
1.10.2003 |
21.1.2004 |
4 months |
WT019C |
Dr. Essam El-Syed |
Treatment Of Oil Produced Brine For Cost-Effective Water Recovery And Its Sustainable Use: Phase1 |
KOC |
1.4.2006 |
30.9.2007 |
18 months |
WT022K |
Mr. Ali Al-Odwani |
Long Term Prototype Study for the Operation, Production, and Quality Control of Kadhmah Water Bottling Plant |
KISR |
1.1.2009 |
1.12.2010 |
24 months |
WT023C |
Dr. E. Al-Sayed |
Assessment of Electrical Power Generation and Water Desalination Plants |
MEW |
1.6.2009 |
30.9.2010 |
16 months |
Wastewater
Project Code |
Project Leader |
Project Title |
Client |
Starting Date |
Completion Date |
Duration |
WW001C |
Mr. S. Ebrahim Dr. M. Abdel Jawad |
Municipal Wastewater Desalination by Reverse Osmosis |
EPA |
1.5.1995 |
30.11.1997 |
31 months |
WT007C |
Dr. A.Shahalam |
Present And Future Wastewater Qualities And Reuse Demand In Kuwait |
KFAS |
1.2.2006 |
21.7.2007 |
18 months |
WT009C |
Dr. S. Al-Shammari |
Feasibility Of Non-Submerged Membranes Bioreactor System For Municipal Wastewater Treatment |
EPA |
1.6.2006 |
30.5.2008 |
24 months |
WT013C |
Dr. A.Shahalam |
Development Of A Wastewater Quality Database And Assessment Of Effluent For Potential Reuse In Kuwait |
KFAS |
1.1.2007 |
31.12.2008 |
24 months |
WT014C |
Mr. Sameer Bou-Hamad |
Application of Microfiltration Technique for Primary and Secondary Treated Wastewater |
KFAS |
1.10.2004 |
30.9.2006 |
24 months |
WT018C |
Dr. A.Shahalam |
Nitrogen And Phosphorus Removal From Concentrates From RO Tertiary Effluent Of Wastewater Treatment Plant |
KFAS |
1.9.2007 |
1.9.2009 |
24 months |
WT021K |
Dr. S. Al-Shammari |
Characterization And Treatment Of Dairy Industry Effluent In Kuwait Using Micro-Filtration Membrane Technology |
KFAS |
1.12.2009 |
1.8.2011 |
20 months |
|
|
|
|
|
|
|
|